Please use this identifier to cite or link to this item:
https://cris.library.msu.ac.zw//handle/11408/4907
Title: | The implementation of de-stress gold mining technique along complex geological structures and heavily fractured ground conditions | Authors: | Sengani, F. Zvarivadza, T. |
Keywords: | De-stress mining deep to ultra-deep gold mines face-perpendicular preconditioning practice Gold mining |
Issue Date: | 2018 | Publisher: | CRC Press | Series/Report no.: | EUROCK2018: Geomechanics and Geodynamics of Rock Masses edited by Vladimir Litvinenko;Chapter 50 | Abstract: | De-stress mining is one of the techniques used in mechanized, semi mechanized and conventional deep to ultra-deep gold mines in South Africa. This mechanism involves the use of face-perpendicular preconditioning practice that transfers induced stress far ahead from the mining faces. This paper aims to highlight the effectiveness of face perpendicular preconditioning practice when mining heavily fractured ground. The trial was conducted in two sections of a deep level gold mine where the mining faces intersected the major faults. The ground conditions in the vicinity of the faults were heavily fractured, the previous geotechnical strategic designs made in order to mine the areas were not successful, leading to some of the ore being left unmined. Eventually, face perpendicular preconditioning practice was developed for such special areas. The developed face-perpendicular practice involved the use of five 4 m long drilled and blasted face-perpendicular preconditioning holes coupled with an increase in support density and with the use of 1.5 m long production holes. During the trial; no face burst/pillar bursting were reported, ground conditions on the hangingwall, sidewall and face were found to improve. A borehole camera was used to validate fracture frequency ahead of the mining faces while a Ground Penetrating Radar (GPR) was used to generate depth of fracturing ahead of the mining faces. Numerical modeling and microseismicity monitoring were also used to verify the results. | URI: | https://doi.org/10.1201/9780429462078 http://hdl.handle.net/11408/4907 |
ISBN: | 9780429462078 |
Appears in Collections: | Book Chapters |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
The implementation of de-stress gold mining.pdf | Abstract | 60.67 kB | Adobe PDF | View/Open |
Page view(s)
62
checked on Nov 28, 2024
Download(s)
18
checked on Nov 28, 2024
Google ScholarTM
Check
Altmetric
Items in MSUIR are protected by copyright, with all rights reserved, unless otherwise indicated.